A transport, logistics or warehousing agreement cannot be reviewed well from the main contract alone. The liability actually borne by a carrier or a warehouse provider often depends on the goods forwarding note, the goods receipt format, the rate card, the insurance policy and the standard operating procedures attached as annexures. This checklist sets out the documents and information usually requested before a review, why each is needed, and the gaps that most often appear. The documents are shared by e-mail, so the review can be done for a business located anywhere in India.
Why the supporting documents matter: a short framework
Under the Carriage by Road Act, 2007, the consignor's goods forwarding note (Section 8), the carrier's goods receipt (Section 9) and any higher risk rate agreed under Section 11 together decide how much the carrier is liable for, and Rule 12 of the Carriage by Road Rules, 2011 links the limit for loss to the freight and the value declared in the forwarding note. Under the Multimodal Transportation of Goods Act, 1993, the multimodal transport document issued under Section 7 carries the terms. For storage, the Contract Act provisions on bailment (Sections 148 to 152) and lien (Sections 170 and 171) are read with the agreement's own "special contract" terms. A review that sees only the main agreement can miss a cap or a lien hidden in a printed receipt or a rate card. The broader review approach is explained on the page on logistics, transport and warehousing agreement review.
Checklist of documents and information to send
1. The current draft agreement, in editable form
Why: comments and a redline are prepared as tracked changes on the draft itself. Common gap: only a scanned PDF of a signed-looking copy is available, which slows the redline and can hide which version is current. Ask the other side for a Word version if one exists.
2. Earlier versions and any marked-up exchanges
Why: earlier drafts show what has already been conceded or rejected, so the review does not reopen settled points or miss a quietly reinserted clause. Common gap: several versions with the same file name and no dates.
3. Annexures, schedules and standard terms
This includes the rate card, service level schedule, standard operating procedure for receiving and dispatch, claims procedure, list of excluded goods, and any "standard trading conditions" referred to but not attached. Why: caps, claim windows and lien rights are often in these documents rather than the main body. Common gap: the agreement says "as per the Provider's standard terms available on request" and nobody has requested them.
4. Formats of the goods forwarding note, goods receipt or consignment note, and proof of delivery
Why: printed conditions on the reverse of a goods receipt or consignment note may limit liability, and the forwarding note is where value is declared. For multimodal movement, the format of the multimodal transport document is needed. Common gap: the business has never seen the back of the printed receipt.
5. Warehouse-specific documents
For a warehousing or 3PL arrangement: the description of the premises, layout or allocated area, any underlying lease or licence of the provider, fire safety and other licences held for the premises, the stock count and reconciliation procedure, and the format of any warehouse receipt to be issued. Where stored goods are to be pledged to a lender, registration details under the Warehousing (Development and Regulation) Act, 2007 are relevant. Why: this decides whether the arrangement is a service, a licence or a lease, which affects stamp duty and registration, and how losses in storage will be proved.
6. The other party's registration and identity documents
Certificate of incorporation or partnership details, GSTIN, common carrier registration under Section 3 of the Carriage by Road Act where road carriage is involved, multimodal transport operator registration where relevant, and Udyam registration if the provider claims micro or small enterprise status. Why: to confirm whom a claim would be made against and whether payment terms are affected by the Micro, Small and Medium Enterprises Development Act, 2006. Common gap: the agreement names a trade name or a broker while invoices come from a different entity.
7. The business's own company documents and authority to sign
Correct legal name, registered address, GSTIN, and a board resolution, power of attorney or letter of authority for the person who will sign. Why: a signatory without authority creates avoidable disputes about whether the business is bound. Common gap: the person negotiating is not the person authorised to sign.
8. Commercial term sheet or summary of what was agreed
Lanes, volumes, rates, credit period, transit times, service levels, term and any minimum commitment. Why: the review checks that the draft reflects the deal actually struck. Common gap: rates agreed by e-mail never reached the draft.
9. Insurance documents
The business's marine transit or stock insurance policy and the provider's goods-in-transit, warehouse or liability cover, if available. Why: the agreement's insurance and liability clauses should fit the policies, including any condition that claims against carriers are preserved. Common gap: each side assumes the other has insured the goods. Policy wording points are discussed on the page on business insurance policy wording review.
10. Description of the goods
Nature, typical value per consignment, packaging, whether any goods are hazardous, perishable or regulated, and seasonal peaks. Why: the right cap, insurance and handling terms depend on what is moved or stored; Section 13 of the Carriage by Road Act applies special rules to goods hazardous to human life.
11. Correspondence and past claim history
Key e-mails, purchase orders, letters of intent and, where the relationship already exists, a summary of past losses, shortages, delays and how they were settled. Why: earlier disputes show which clauses matter in practice. Common gap: claim records are with the warehouse team and never reach the person sending the draft.
12. Internal process information
How goods are received at the business's own sites, who signs proof of delivery, and how quickly damage is checked. Why: notice periods in the agreement must be workable for the receiving team; a window the team cannot meet is of little use.
13. Deadlines and the state of execution
The date by which the agreement must be signed and the state where it will be executed. Why: stamp duty varies by state (for example, Maharashtra, Tamil Nadu, Telangana and West Bengal each have their own schedule), and a lease of premises for more than one year is compulsorily registrable under Section 17 of the Registration Act, 1908.
How the documents are used once received
The documents are first indexed and matched against the draft, so that every annexure, schedule and standard term referred to in the agreement is actually on file. The goods receipt and forwarding note formats are read alongside the liability clause to see what cap applies in practice. The insurance policies are compared with the insurance and waiver clauses. The term sheet is compared line by line with the rates, volumes and service levels in the draft. Where a document is missing, a short list of follow-up questions is sent rather than an assumption being made, and the issues list notes which points depend on information still awaited. This keeps the comments tied to the business's real position and makes the later negotiation with the transporter or warehouse provider shorter and more focused.
Common mistakes when sending documents for review
- Sending the main agreement but not the annexures, rate card or printed receipt terms.
- Not saying which side's draft it is or which points the other side has already refused.
- Leaving out the commercial background, so the review cannot test the draft against the deal.
- Assuming insurance is in place without sending the policy.
- Sending documents after the signing date is already fixed, leaving little room for negotiation.
- Forwarding documents in several separate e-mails with no index, so a key annexure is missed.
Once the documents are in, the review follows the stages set out on the page on the step by step review process. For supply contracts on the purchase side, see vendor and supplier contract review.
Frequently asked questions
What documents are required for review of a transport agreement?
The draft agreement in editable form, annexures and rate card, formats of the goods forwarding note, goods receipt and proof of delivery, the carrier's registration and GST details, the business's authority to sign, a summary of commercial terms, insurance policies and relevant correspondence.
Why is the goods receipt format needed if the main agreement is being reviewed?
Printed conditions on a goods receipt or consignment note can limit liability, and the forwarding note is where value is declared. Under the Carriage by Road Act and Rules these documents affect how much can be recovered.
What should be checked before signing a warehouse agreement?
The nature of the arrangement (service, licence or lease), storage standards, stock count and reconciliation, shrinkage, lien, insurance, exit and return of goods, and stamp duty and registration in the relevant state.
Is the transporter's common carrier registration relevant to the review?
Yes. Section 3 of the Carriage by Road Act requires registration to carry on business as a common carrier. Confirming the registered entity also tells the business whom a claim would be made against.
Should insurance policies be sent along with the agreement?
Yes. The agreement's liability and insurance clauses should fit the policies, and a waiver or release in the agreement can affect an insurer's right to recover from the carrier.
Can documents be sent by e-mail from another state for review?
Yes. Documents are shared by e-mail and discussed on a call or video call. The state of execution is noted so that stamp duty and registration points are checked for that state.
What if only a scanned copy of the draft is available?
A scanned copy can be reviewed, but an editable version allows a proper redline. Asking the other side for the editable file early saves time later.
This article explains the general legal position for information only. It is not legal advice, and the outcome of any matter depends on its own facts and the rules that apply to it.
Related: Logistics, transport and warehousing agreement review. Logistics agreement review: step by step process. Vendor and supplier contract review. Business insurance policy wording review.